Overfill detection system for grouted piles based on magnetic detection technology
Author:
Affiliation:

1.School of Information and Control Engineering, Qingdao University of Technology, Qingdao 266520, China; 2.Metallurgical Geological Administration of China, Shandong Bureau Group, Qingdao 266035, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    检测混凝土界面位置是控制灌注桩超灌高度的关键所在,传统方法凭借人工经验测定混凝土界面位置的误差较大,不能有效地控制灌注高度。针对浇注时混凝土界面难以判别,导致混凝土欠灌或超灌过多等问题。首次提出基于磁探测技术的灌注桩超灌检测方法,首先利用钻孔中不同介质的密度差异设计磁性目标,然后通过测量和处理磁场三分量数据,实现探测混凝土界面位置从而控制混凝土灌注高度。设计了一套基于磁探测技术的灌注桩超灌检测系统,通过室内试验完成测点选择,并将磁性目标比重设计为2.1 g/cm3,报警阈值标定为333 mG。通过施工现场试验验证:系统实现快速检测混凝土界面到达桩基标高和超灌上限位置,准确完成两级预警实现了自动化检测,解决了施工现场混凝土欠灌或超灌过多的难题,有效地减少了混凝土的浪费。

    Abstract:

    The detection of concrete interface position is the key to control the overfilling height of the pile. The traditional method of determining the concrete interface position by manual experience has a large error and cannot effectively control the filling height. It is difficult to discriminate the concrete interface during pouring, which leads to the problem of underfilling or overfilling of concrete. The first method of overfilling detection based on magnetic detection technology is proposed. Firstly, the magnetic target is designed by using the density difference of different media in the borehole, and then by measuring and processing the three-component data of magnetic field, the concrete interface position is detected to control the concrete filling height. This paper designs a set of overfill detection system based on magnetic detection technology, completes the selection of measurement points through indoor tests, and designs the magnetic target specific gravity as 2.1 g/cm3, and the alarm threshold is calibrated as 333 mG. Through construction site tests, it is verified that the system achieves rapid detection of concrete interface to the pile elevation and overfill ceiling position, and accurately completes two levels of warning to achieve automatic detection, which solves the problem of It solves the problem of concrete underfilling or overfilling at the construction site, and effectively reduces the waste of concrete.

    参考文献
    相似文献
    引证文献
引用本文

宋传旺,郭成龙,李运红,张莅详,金承满.基于磁探测技术的灌注桩超灌检测系统[J].电子测量技术,2023,46(14):43-

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2024-01-18
  • 出版日期:
文章二维码